Collab Week 2
Week 2 Goals:
​Take into consideration the feedback from week 1, create a finalized (or almost finalized) pitch deck for the mentors in week 3, and figure out locations.

Team Pixel Punks
Commercial Concept:
An ad for the streaming service "MAX", stemming from the idea of being transported into the world of the TV show one is watching.
Week 2 Accomplishments:
-
Flesh out a more specific workflow of how our pipeline will work out.
-
Rough model of the apartment
-
Reserving Gear and Locations
-
Fleshing out filming pipeline and workflow
-
Finalizing shots

Pitch Presentation
Feedback from Pitch:
-
Work on finalizing shots
-
Finalize locations
-
Focus on reactions of actor in shots
-
Work on transitions
-
Work on Last of Us environmental transition
-
Work on the contrast between the locations of the apartment vs the TV show environments

Previz

Alternate Cut for Previz
General Synopsis:
Week two came with its struggles, mainly with nailing down a location. With it being the Spring Quarter at SCAD, many Film majors are filming their thesis projects, so we were not getting anywhere easily for sets. However, we were able to book the Apartment set at Hamilton Hall's Studio B Green Screen (after deciding whether to use the Green Screen at Montgomery Hall, the Savannah Film Studio's XR stage (LED Volume), and the original apartment where the previz was filmed). The initial Batman scene was also cut for time, so the ad will consist of the Last of Us and Friends. We've concluded that we're also going to have the transition from the apartment to the Last of Us be a growth transition, where the apartment becomes overgrown on screen (see growth sim below).
​
​
Locations:

SCAD Savannah Film Studios XR Stage

SCAD Montgomery Hall Green Screen Stage


Original Apartment Set
New Apartment Set - SCAD Hamilton Hall Green Screen Stage

Growth Sim

Unreal set for Batman scene if we were going to use the XR Stage

Models and Photogrammetry Scans of the original apartment for CG environment use in Last of Us transition

Rough initial scan of new apartment set at Hamilton Hall
Moving Forward:
Essentially we will be gathering gear, renting out locations, locking down a final actor and crew, rehearsing and filming Week 3. See Week 3 goals below:
​
Week 3 Goals:
-
Create a final scan of the new apartment set
-
Finalize shots, workflow, and filming locations and times
-
​Finalize equipment list and check out equipment
-
Film shots